Provide feedback on the draft design concepts for Hwy 22 and Hwy 109 in Wells!
View the draft design concepts for Hwy 22 and the west segment of Hwy 109 in Wells and tell us what you think about the designs in the following activities.

Survey
Take a short survey about the draft design concepts
Project overview
MnDOT will be reconstructing Hwy 22 (also known as 2nd Ave) in Wells from the northern intersection with Hwy 109 (3rd St NW) to just south of 12th St SW. Hwy 109 (also known as 1st St NW) will also be reconstructed from west of Rose Hill Cemetery to Hwy 22 (2nd Ave). The purpose of the reconstruction project is to replace the aging pavement and utilities and to improve sidewalks and make them accessible for everyone. Construction is anticipated to begin in 2026.
